hot sale light deprivation/blackout greenhouse made in China
Standard size | Pipe size | Blackout system | Covering | Cooling system | Heating system | Control system |
20x100 feet | φ32*2.0mm; φ50*2.0mm | yes | Yes | customized | customized | YES |
30x100 feet | φ32*2.0mm; φ50*2.0mm | yes | yes | customized | customized | YES |
33x100 feet | φ32*2.0mm; φ50*2.0mm | yes | yes | customized | customized | YES |
1. Steel Structure
The main galvanized framework -φ60*2.0mm, φ32*2.0mm, 50*50*2.0mm, φ25*1.5mm, etc
2. Shade net
The shading rate 99% black shade net, 2 layers and 3 layers is widly used for mdical plants, we will need gear motor, rack, pinions, drive shaft, etc
3. Cooling system
The cooling system has cooling fan, cooling pad, circulation fan. The light drap is necessary.
4. Heating system
The diesel heater is easy to move, no smell, no smoke, no moisture, low noise, good thermal efficiency, fast heat transfer
Shouguang Greentime Agriculture Technology Co.,Ltd is a professional manufacturer and exporter of greenhouse &configurations.
It is located in shouguang City, which is famous for "the hometown of vegetables" in China.
The main products comprise Light Deprivation Greenhouse, Glass Greenhouse, Polycarbonate Greenhouse, Plastic-film multi-span Greenhouse, Tunnel greenhouse, and Solar greenhouse etc.
Moreover, We also have Greenhouse Materials, they can match all the kinds of greenhouse.
Including greenhouse materials comprise Skeleton system, Aluminum-profile system, Covering system, Shading system, Ventilation system, Cooling system, Heating system, Seedbed system & irrigation system, Hydroponic system.
1. How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 15-60days.
2. Can you supply sample?
Small parts can be supplied, but you should pay the express cost.
3. Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract.
4. How to install greenhouse ?
Firstly we prepare the material and send the material to your city.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers.
If you think it is hard to build the greenhouse, we also can send engineers and workers to install for you.
5. When installing, what cost should we pay?
Our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication